Car Wash Closing
Car Wash Closing
Jul 9 all-day
Car Wash Closing
Big changes are coming! Our car wash will be closed starting this Monday, July 9th as we begin our big remodeling project! We’ll be putting in a new, state-of-the art touchless car wash and will ... Read more
10
Update
Update
Jul 10 all-day
New windows installed. Old equipment removed. The electricians finished shutting off power.
11
Update
Update
Jul 11 all-day
Garage Floor Coating of MN started work on putting in a new floor.  The day was spent preparing the new floor for resurfacing.  The new surface will be the same as is used on our ... Read more
12
Update
Update
Jul 12 all-day
The flooring company finished up the removal of the old surface in each of the bays.  Meanwhile, the electrician took one more check to be sure power into the bays is safely contained.
13
Phase One: Demolition – Complete
Phase One: Demolition – Complete
Jul 13 all-day
Phase One: Demolition is complete.  All ready to start installation.  Meanwhile the Car Wash office is also getting a face lift.
14
15
16
Update
Update
Jul 16 all-day
Wall panels were delivered.  Inside bay walls were prepared for installation of panels.
17
Phase Two: Installation
Phase Two: Installation
Jul 17 – Jul 27 all-day
Installation of new wall paneling and ASI equipment.  The new flooring will also be put down during this phase.  Anticipated Phase Two completion: 11 days
18
19
20
21
22
23
24
25
26
27
Phase Three: Connection
Phase Three: Connection
Jul 27 – Jul 31 all-day
Electricians and plumbers will begin reconnecting power and water.  The goal is to have this completed in 4 days.  Also, chemicals for the wash will be delivered so testing can begin by the end of ... Read more
28
29
30
31